3 Things Architects Get Wrong When Specifying Custom Fabrication
After years of building custom furniture, fixtures, and architectural elements for design professionals, I keep seeing the same mistakes eat into budgets and timelines.
1. Specifying materials before consulting your fabricator.
That reclaimed oak looks incredible on your mood board, but if the piece needs to hold 200 lbs per shelf in a commercial install, we might need to reinforce with steel — or suggest an engineered alternative that looks identical and costs 30% less.
2. Underestimating lead time on finishes.
Powder coating, patina treatments, and specialty lacquers can add 2-4 weeks. If you're working backwards from an install date, loop us in early so we can plan around finishing schedules.
3. Not providing site dimensions until the last minute.
A 1/4" discrepancy between your plans and the actual wall can mean the difference between a seamless built-in and a visible gap. We always recommend a site visit before final drawings.
Bring us in early and we'll save you time and money. That's what HKH Projects is about — design-fabrication partnership, not just order fulfillment.
Got a project in mind? Reach out — first consultation is always free.