Most rejected submittals fail before anyone reads the engineering. ๐
Missing data sheet. Wrong revision. No transmittal.
Save this 6-point check for your next submission:
Number + revision match the register
References point to current revisions
Signatures and dates complete
File name follows the convention
Transmittal attached
Right attachments for the document type
Free Excel checklist (submission + 43-item handover) โ link in bio
#documentcontrol #documentcontroller #construction #constructionmanagement #projectmanagement #qaqc #engineering #civilengineering #pmo #excel
