The 3 numbers that kill more flips than bad contractors do
Been building tools around flip underwriting lately, and the pattern is always the same: deals don't die because of the renovation — they die because someone was sloppy on three numbers before they ever made an offer.
1. ARV (After Repair Value)
Most new flippers pull 2-3 comps and call it a day. You need at least 5-6, adjusted for square footage, lot size, and finish quality — not just "sold in the same zip code last year." A 5% miss on ARV on a $350k flip is $17,500 of margin gone before you've bought a single 2x4.
2. Repair cost padding
If your contractor bid and your actual spend are ever the same number, you got lucky. Pad every bid 15-20% minimum. Permits, change orders, and "oh, the sewer line's cracked" always show up.
3. Holding cost math past 90 days
Everyone budgets holding costs for their target timeline. Almost nobody budgets for what happens if the reno runs long or the house sits 60 extra days on market. That's the scenario that turns a $40k profit into a $5k profit.
The fix isn't more spreadsheets — it's running the ARV/repair/margin math on every lead the moment it hits your desk, before you fall in love with the house. That's the whole reason I built FlipRadar: it scans listings and off-market leads daily and instantly kicks out ARV + repair + profit estimates so the bad deals get filtered out before they waste your time.
Curious what other flippers here are doing to protect margin — drop your process below.
