



Critical infrastructure projects demand thorough documentation of every pre-pour inspection. This check sheet captures all required sign-offs in the sequence they happen on site, from rebar verification through final authorization. It’s designed specifically for data centres and other projects where earthing, MEP sleeves, and equipment anchor bolts must be checked and approved before the concrete truck arrives.
The template records pour details including project and location information, element identification, ITP and IR references, concrete mix specifications, exposure class, volume, supplier details, placing method, weather conditions, and planned test specimens. It follows the actual workflow of a real pour, ensuring nothing gets missed and every inspection is documented with timestamps and signatures.
What’s included: